Skip to main content

Room and workflow comparison · reviewed September 14, 2026

xTool F2 Ultra vs P2S

One is a tall, compact galvo platform; the other is a wide desktop CO₂ cabinet. Compare process requirements and material geometry first, then use the very different room envelopes to eliminate what does not fit.

  • Official xTool sources
  • Closed body ≠ operating footprint
  • Unknowns kept visible
  • Paid links labeled
01 · Side-by-side room evidence

Compare the fields that can change the room.

FieldxTool F2 Ultra Dual 60W MOPA + 40W diodexTool P2S 55W CO₂
Laser system60 W 1064 nm MOPA infrared + 40 W 445 nm blue-light diodeSee current official source
Closed machine11.57 × 16.88 × 20.51 in / 294 × 429 × 521 mm used for conservative display; the support guide lists 520 mm39.4 × 25.2 × 10.6 in / 1000 × 639 × 268 mm
Machine weight47 lb / 21.6 kg99.2 lb / 45 kg
Work area8.66 × 8.66 in / 220 × 220 mm; 8.66 × 19.69 in / 220 × 500 mm with Auto Streamline Conveyor23.6 × 12.0 in / 600 × 305 mm
Maximum object-height evidence150 mm published maximumNo normalized value in this comparison; confirm the exact setup
Delivery packageNot published in cited sources44.2 × 28.6 × 13.6 in appears in official education and refurbished listings that mix P2/P2S copy; confirm the exact current SKU
Electrical evidencePower-adapter input 100–240 VAC, 50/60 Hz; 400 W maximum machine input on the family listing100–120 VAC; maximum 700 W; region and frequency should be verified
Exhaust80 mm smoke-exhaust pipe in current compatibility guidanceExhaust pipe supplied; exact port diameter not published in cited sources
Safety classClass 4 (MXF-K003-002)Confirm exact model and current manual
Numeric clearanceNo numeric operating, service, conveyor-travel, hose-bend, cable, or accessory clearance published in cited sources.No numeric lid or service clearance published in cited sources.

These are public-documentation facts for preliminary planning. A value does not certify the delivered SKU, room, electrical service, exhaust or filtration, fire safety, material, venue, or code compliance.

02 · What changes the decision

F2 Ultra Dual occupies less closed bench area and weighs less, while P2S publishes a much larger flat work area. Neither is the better choice until you account for the intended process, project dimensions, package evidence, air path, and operating envelope.

Body geometry

Tall, compact body vs. wide CO₂ cabinet

F2 Ultra Dual is 294 × 429 × 520–521 mm across reviewed first-party sources; P2S is 1000 × 639 × 268 mm. Those are closed bodies, not installed operating envelopes.

Work area

220 mm square vs. 600 × 305 mm

The standard F2 Ultra work area is 220 × 220 mm. P2S publishes a 600 × 305 mm work area; project fit and material handling remain separate from machine footprint.

Laser system

MOPA and diode vs. 55 W CO₂

F2 Ultra Dual uses a 60 W MOPA infrared source plus a 40 W blue-light diode. P2S uses a 55 W CO₂ source. Use current manufacturer material guidance for the exact process.

Delivery evidence

Neither has complete, universally applicable carton data

No F2 Ultra main-machine packaging data was found. P2S carton dimensions appear only on listing-specific pages that mix P2/P2S copy, without a package weight.

03 · Questions before purchase

Close these gaps with the manufacturer and the people responsible for the site.

  • Do the actual project rectangle, thickness, fixture, and material path fit the documented work area?
  • Which laser system is supported for the exact material and desired process?
  • Can the bench support 47 lb or 99.2 lb plus every accessory, workpiece, and handling load?
  • Which package dimensions, lid and service zones, exhaust termination, cooling access, and wall-side load apply to the chosen bundle?
04 · Current seller options

Open the exact listing—not a remembered specification.

Paid xTool link

xTool P2S 55W CO₂

Check the current configuration, bundle contents, price, availability, and seller terms. The room evidence above remains unchanged.

Check current P2S 55W CO₂ options ↗
05 · Official evidence

First-party sources used for this comparison

06 · Complete the decision

Move from comparison to a measured setup.

Price the complete setup only after the room requirements are clear.

Seller price is one line item. Add air management, support, accessories, site work, shipping, tax, and starter materials.

Open setup-cost builder